Jimmie Davis Bridge – LA 511 – DESIGN-BUILD project
Location: Shreveport, LA (Bossier / Caddo Parish)
Dates: March 2023 – Present
Huval And Associates is the main design engineer for the project to construct the new four-lane bridge across the Red River between Bossier Parish and Caddo Parish.
The project includes the reconstruction of two miles of LA 511 into a modern, four-lane median-divided highway.
The project encompasses the creation of full access interchange connections at two key junctions: Arthur Ray Teague Parkway and Clyde Fant Memorial Parkway. These interchanges will seamlessly integrate with the upgraded LA 511.
The initiative also includes the transformation of the existing Jimmie Davis Bridge into a Linear Park.
SERVICES UTILIZED:
Design
- Fixed Bridge Design
- Roadway – Highway Design
Key Project Members
David S. Huval Sr. – Principal
Thomas Gattle III P.E.- Project Manager – Design Manager
Justin Peltier P.E. – Bridge Design Engineer
Reid Romero P.E. – Bridge Design Engineer
Nick Helminger P.E. – Roadway Design Engineer
Colby Guidry P.E. – Bridge Design Engineer, Q.C.
Careers
At Huval & Associates, we believe that our people are our future. We are always on the lookout for employees who share our passion, innovation and commitment to providing clients with expert design and engineering services. Interested parties should forward a CV with the form below for consideration.