I-49 at verot school road
Location: Lafayette Parish
Dates: June 2016 – Present
Huval leads a group of firms providing preliminary engineering and related services to construct 2.4 miles of mainline freeway and an interchange at the intersection of I-49 South/US 90 and Verot School Road.
The project consists of an above-grade bridge structure on Verot School Road that traverses over I-49 South/US 90 mainline roadway and parallel railroad.
The project also includes one way frontage roads on both sides of the mainline roadway, a two-way collector service road east of the mainline roadway, and a new alignment of Verot School Road from the interchange to an existing bridge structure.
A roundabout will be utilized as the intersection between the reconstructed and realigned Verot School Road and South College Drive.
Huval was given Notice to Proceed in July of 2016 which began Phase 1 of the design project.
Phase 1 : Topographic Survey, SUE Services, Traffic Engineering Analysis, Conceptual Roadway Design and Bridge Design, Preliminary Geotechnical Studies, Public Meetings and Outreach.
Phase 2 : Preliminary Planning – Completed March 2022
SERVICES UTILIZED:
Planning
– Preliminary Planning
– Traffic Management Planning
– Design Planning
Design
– Bridge / Structural Design
– Roadway Design
– Drainage Design
Key Project Members
David Huval Sr. P.E. – Principal, Structural Design
Thomas Gattle III P.E. – Project Manager, Lead Designer
Nick Helminger P.E. – Roadway Design
Michelle Helminger P.E. – Roadway Design
Justin Peltier P.E. – Design Engineer
Careers
At Huval & Associates, we believe that our people are our future. We are always on the lookout for employees who share our passion, innovation and commitment to providing clients with expert design and engineering services. Interested parties should forward a CV with the form below for consideration.